E-tender No: RBI/Kolkata Regional Office/Estate/17/25-26/ET/640 In terms of E-Tender No. RBI/Kolkata Regional Office/Estate/17/25-26/ET/640 dated November 24, 2025 a pre-bid meeting was held at the Conference Room, Estate Department, 3rd floor, Reserve Bank of India, 15, N.S Road, Kolkata 700001 on December 02, 2025 at 11:00 Hrs. The meeting was attended by representatives of the prospective tenderer and following officials of the Bank | Sl. No. | Name of the Representatives from Bank | Designation | | 1 | Shri Pramod Kumar Gupta | GM (Tech-Elec) | | 2 | Shri Kiran Paul | AGM | | 3 | Shri Rabindra Nath Kisku | Manager (Tech-E) | | 4 | Shri Rakesh Kumar Mishra | AM (Tech-Elec) | | 5 | Shri Suraj Dattatraya Rane | AM | | 6 | Shri Vikas Kumar | JE (Electrical) | 2. Following a brief introduction by the Bank regarding the e-tender, the queries of the participants were discussed in the meeting and the clarification issued are as given below: | Sr. No. | Tender Clause / Participants Proposal | Clarification / Response of RBI | | 1 | Participants requested to provide the amount details of tender fees to be submitted for bid participation. | The tender fee is decided by MSTC based on estimated cost of work. Therefore, in this regard, the MSTC helpline shall be contacted. The contact details of MSTC are available in the tender document as well as on their portal. | | 2 | Discrepancy in EMD amount mentioned in para 3 of "Section I: Form of Tender" on page no. 16: "We have deposited a sum of Rs. 1,60,000/- as earnest money with RBI, which amount is not to bear any interest." | It is clarified that EMD amount is ₹1,20,000/-. Accordingly, para 3 of "Section I: Form of Tender" on page no. 16 shall be read as: "...We have deposited a sum of ₹1,20,000/- as earnest money with RBI, which amount is not to bear any interest..." | | 3 | Participants requested to consider the reduction in requirement of Performance Bank Guarantee (PBG) during NCAMC. | The requirement of Performance Bank Guarantee during NCAMC has been restructured and the para 3.10.3 (b) shall be read as follows: After completion of the DLP of 1 year from the date of virtual completion, for the due fulfilment of the terms and obligations of the NCAMC period, the successful tenderer shall furnish BG (Bank Guarantee) from any schedule Bank in the form prescribed by the Bank as per Annex towards Security Deposit as follows: (i) an amount equal to 10% (Ten percent) of the Contract value (project work) valid for initial 4 years of NCAMC. (ii) Two months before the expiry of the above BG, a new BG of an amount equal to 5% (Five percent) of the Contract value (project work) valid for remaining 5 years of NCAMC Contract value is defined under para 3.10.3 (a) of the Tender | | 4 | Completion Period: SITC of DG Set in Bank’s main office building and Bank’s Annex building shall be completed within 50 days from the 10th day of the issue of work order. | It has been decided to extend the completion period from 50 days to 60 days. Accordingly, Para 3.14.4 has been revised as: "SITC of DG Set in Bank’s main office building and Bank’s Annex building shall be completed within 60 days from the 10th day of the issue of work order." | | 5 | Under Para 3.15 on page no. 36, it is mentioned that: "During this period, servicing at not less than FOUR servicing or as prescribed by the manufacturer shall be carried out,..." | The clause has been reviewed and shall be read as: "During this period, servicing at not less than SIX services or as prescribed by the manufacturer, whichever higher, shall be carried out, ..." | | 6 | Refer page no. 77, "AMF POWER CONTROL PANEL - Micro Processor based AMF Panel:" | It is clarified that, "Built-in boost cum trickle Battery Charger" shall be read as "Built-in SMPS Charger or boost cum trickle Battery Charger". | 3. In reference to “PART II (unpriced Bid / Bill of Quantity)” of the Tender following points were clarified to the participants. a) Quantity mentioned for item no. 3 and 4 stands revised from 12 meters to 6 meters. Accordingly, item no. 3 and 4 of the Unprice-bid shall be read as follows: | Sr. No. | Description | Quantity | Unit | | 3 | EXHAUST PIPE - Supply, installation, testing and commissioning of MS ‘C’ class ISI (thickness 4.8mm) 250mm dia. pipe with bend including necessary cutting, welding bending etc, and with supporting angle iron structure for pipeline. Height of exhaust pipe should be as per local pollution control board (PCB) norms so as to obtain NOC from State Pollution Control Board | 6 | Meter | | 4 | EXHAUST PIPE INSULATION - Supply, installation, Testing & Commissioning of 50 MM thick, mineral wool insulation of 100 KG per cubic meter density warp with 24SWG aluminium sheet for exhaust piping and bend etc. | 6 | Meter | b) In addition to the 6 items mentioned in the unprice-bid, below mentioned item no. 7 and 8 shall also be part of the Unprice-bid in line with the Price-Bid. | Sr. No. | Description | Quantity | Unit | | 7 | Less buyback for dismantling and taking away existing old 320KVA DG set and its AMF panel, exhaust pipe etc inclusive of GST, as is where is basis. | 1 | Lot | | 8 | Cost per annum for Non-Comprehensive Annual maintenance contract for the 500 KVA DG set including canopy, AMF Panel complete set as per terms and conditions specified in Part-I, inclusive of GST. | 1 | Per Annum | 4. Following the pre-bid meeting, a site visit was conducted for all the participants. 5. Further, the participants were advised to go through the tender document and the tentative scope of work in entirety. They were also advised to register on the MSTC portal (Version 3) at the earliest in order to participate in the e-tender and contact MSTC personnel for any technical issues regarding registration, bidding etc. on the MSTC portal (https://mstcecommerce.com). 5. Above minutes shall be treated as a part of the tender. All other terms and conditions of the tender shall remain unchanged. Regional Director Reserve Bank of India, Kolkata |