Corrigendum dated November 03, 2020 Corrigendum dated October 23, 2020 Corrigendum dated October 20, 2020 e-Tender No. RBI/RBSC//167/20-21/ET/167 The captioned meeting was held at 11:00 a.m. on September 29, 2020 at the Conference Hall, RBSC, Chennai. The meeting was chaired by Smt. P. Kavitha, Deputy General Manager and the undernoted Officers/ Staff attended the meeting: -
Shri Sunil M. R., Manager (Estate Cell) -
Shri Godwin Justin, Assistant Manager (Estate Cell) -
Smt. Haarika Reddy K., Assistant Manager (Tech - Civil) -
Shri Rajeev S. J., Junior Engineer (Electrical) Representatives from the following vendors attended the meeting: -
M/s. Enmac Systems Pvt. Ltd. -
M/s. Stulz Chspl India Pvt. Ltd. Further, M/s. Schneider Electric IT Business forwarded their queries, which have been incorporated in the clarification given below, through e-mail. Smt. P. Kavitha, DGM, welcomed the representatives of the vendors. Clarifications on queries raised by vendors in the meeting and through e-mail are furnished below: Sl. No. | Queries Raised | Clarifications by RBSC | 1. | Design temp parameters not mentioned in tender, indoor temp & RH, Ambient. Kindly clarify. | • Indoor Temperature- 20 ± 1 ºC • Relative Humidity- ≤ 50 % • Please consider ambient temperature of Chennai for design purpose. | 2. | Equipment heat load inside the Room. Also give us a clarity of the equipment to be kept inside the room. | Equipment heat load has been calculated and 3.5 TR Precision AC is sufficient. Equipment to be kept inside the room: Server- 5 Nos, storage devices, L3 switches- 2 Nos and other associated accessories in a 42 U rack. | 3. | PLAN Layout checking the installation feasibility. Floor at which this data centre is placed. | Floor size will be approximately 3.6 meter x 3.5 meter. | 4. | Location of Indoor & Outdoor. | Indoor unit will be inside the proposed IPCCTV server room and Outdoor unit will be on the terrace. | 5. | False floor height, if any. | 450 mm from the floor. | 6. | Indoor to outdoor distance (Vertical height). | Approximately 7 meters. | 7. | Type of compressor – Inverter scroll/ Tandem scroll. | Any type of scroll compressor. | 8. | Being Chennai location (Seashore), shall we consider Anti-corrosive condensers? Kindly clarify. | Condenser specification as mentioned in the BoQ. | 9. | Request for change of terms of payment, AMC conditions and relaxation in Bank Guarantee period. | Terms of Payment, AMC conditions and Bank Guarantee shall remain unchanged. | 10. | Experience in other AC related work is acceptable as qualifying works? | Please see the definition of similar works- refer Section II para A.i | 11. | Details of existing flooring. | Tile flooring is available now. The vendor has to provide floor insulation on the tile floor. | The representatives inspected the location of the proposed IPCCTV server room, after the meeting. Chief General Manager/ Principal Reserve Bank Staff College 359, Anna Salai Teynampet Chennai – 600 018 October 01, 2020 | |