Corrigendum In terms of Schedule of Tender (SOT) for Part-I of the tender document, a pre-bid meeting was held on July 04, 2023 at 11.00 a.m. in the Meeting Room at Fourth Floor of Main Office Building, Reserve Bank of India, Ahmedabad. 2. List of Bank officials who attended the meeting: | 1. | Shri Devendra D. Bonde | Deputy General Manager | | 2. | Shri Nitin Dolare | Assistant General Manager | | 3. | Shri Mahipal | Assistant Manager (Electrical) | | 4. | Smt Vruti Patel | Assistant Manager | | 5. | Shri Nishant Pandey | Junior Engineer (Electrical) | | 6. | Shri Devanshu Chouhan | Assistant | List of representative of the firms/ prospective bidders who attended the meeting: | Sr. | Name of the Firm | Name of the Participant | | 1. | M/s Riello Power India Private Limited | Shri Brijesh Rana | | 2. | M/s Vertiv Energy | Shri Dipal Desai Shri Hardik Prajapati | | 3. | M/s ProstarM Info Systems Limited | Shri Vipul Dabhi | | 4. | M/s Socomec Innovative Power Solutions Private Limited | Shri Ashish Jain | | 5. | M/s Numeric Power Systems Limited | Shri Bhavesh Khatri Shri Manojkumar Modi | 3. The meeting was presided over by DGM (Estate Department) and it began with the introduction of team members from Estate Department. Assistant Manager (Technical-Electrical) & Junior Engineer (Technical-Electrical) explained in detail relevant technical aspects of the work as mentioned in tender document. Further, participating firms were asked to raise their doubts or queries, if any, regarding terms and conditions of the tender work. 4. The queries raised by the prospective bidders pertaining to captioned tender and clarifications for the same by the Bank are tabulated below-: | Clause/ Page No. of Tender Document | Queries by the vendors | Clarifications furnished by RBI | Clause 2/ Page 55 (Section XI) Clause 12/ Page 56 (Section XI) | 1) M/s Vertiv Energy has queried whether isolation transformer can be provided externally with copper winding for 2X20 KVA UPS or transformer with Aluminium winding may be provided internally. 2) Further, firm enquired whether overload capacity of the inverter can be changed in the specifications. | 1) Isolation transformers with Copper winding are to be provided. The same may be provided externally for 2X20 KVA UPS as per tender specifications/details as per section XI and Section XII. 2) No change in overload capacity is permitted. Please follow the tender specifications, B-5 Page 57. | Clause K/ Page 59 (Section XI) Clause 2/ Page 55 (Section XI) | 1) Riello Power India Private Limited raised query regarding warranty period of batteries and UPS. 2) Whether isolation transformer should cover static bypass path also. | 1) Warranty period for batteries is three years from the date of virtual completion as specified in the tender. For UPS, defect liability period is one year from the date of virtual completion. 2) Yes, please follow the tender specifications. | Clause K/ Page 60 (Section XI) Clause N/ Page 61 (Section XI) | 1) Numeric Power Systems Limited raised query related calculation of backup time of batteries. 2) Firm has queried regarding distance of Remote Indication Panel from location of UPS system. | 1) As specified in the tender, back-up of 30 minutes is to be provided at 100% load (unity power factor) and the same will be tested by Bank’s Engineer/s during factory inspection of the UPS. Delivery of at least one set of battery bank for 20 KVA and 120 KVA respectively is to be arranged for the same at factory. 2) Approximate distance of remote indication panel from location of UPS system is upto 100 mtr as per tender specification. Technical team of the Estate Dept. has accompanied all the participating firms to the actual site location to enable them to ascertain approx. distance of remote indication panel from location of UPS. | 5. The intending participants were advised that no deviation in commercial terms and conditions will be accepted by the Bank and all other technical specifications will be strictly adhered to as per tender. Henceforth, this document of the pre-bid meeting shall form a part of the tender and shall be duly signed and stamped by the bidder. Further, copy of the same must be uploaded along with Part-I of the tender. Any bid received without signature and stamped copy of this document is liable to be rejected. The meeting ended with vote of thanks to all representatives. (Regional Director) RBI, Ahmedabad | |