Corrigendum Pre-bid meeting for the captioned tender was conducted on May 06, 2025 at 11:00 AM in the Estate Department, RBI, Jaipur. List of participants is furnished in the Annexure. Summary of the discussion held in the meeting is tabulated below: S. No. | Queries raised by the intended Tenderers | Clarifications by the Bank | 1. | Whether solar panel needs to be DCR? | All the specifications are mentioned in the tender. Please refer to the tender document. | 2. | One of the bidders was facing problem while registration on MSTC Portal. | Bidders were advised to ensure that they are registered on the MSTC Portal (Latest Version). Bidders were asked to coordinate with MSTC Support persons if they face any issue while undertaking the bidding process for the captioned e-Tender, to ensure submission of bid within the stipulated timeline. | 3. | How L1 calculation for the tender will be done. | L1 calculation will be done as per the tender document. | 4. | With reference to Page 71, Clause-E (Earthing), whether the proposed 20kWp solar plant can be connected to the existing earthing network of the existing plants. | Separate earthing shall be provided as per tender terms and conditions. | 5. | With reference to Page 71, Clause-F (Testing & Commissioning), all works shall be done by the Vendor, except Net Metering. Clarification was sought for the same. | Net Metering is already done by the Bank. | 6. | Whether the pre-delivery inspection (Factory Acceptance Test) of equipment shall be carried at the factory premises of the manufacturer? | Bank reserves the right to carry out the factory inspection before delivery of the material / equipment. | Annexure Participants of the Pre-Bid meeting conducted on May 06, 2025 S. No. | Name of Representatives of the Firms | 1. | Shri Harsh Pilania, M/s Tiruhari India Pvt. Ltd. | 2. | Shri Sunil Bhati, M/s Ultra Vibrant Solar Energy Pvt. Ltd. | 3. | Shri Jitendra Kumar, M/s Ultra Vibrant Solar Energy Pvt. Ltd. | Regional Director Reserve Bank of India, Jaipur | |