Sr. No. | Query raised by Vendor | Clarification of queries |
1. | What is the Validity of quotation/tender? | Tender will remain valid for acceptance by the Bank for 90days from the date of opening of Part I of the tender |
2. | What is the penalty for reduced energy generation? | Please refer page no. 20 of tender document regarding Penalty for Reduced Generation |
3. | Whether FRLS graded cable is mandatory for DC connection? | FRLS cable is to be used as per tender specifications. |
4. | Whether Aluminium make cable can be used for AC connection? | No. Only Copper cable to be used for AC connection. |
5. | Total no. of meters required for the project | 5 generation meters and 3 net meters for colonies required. One net meter in CAB campus may be upgraded if required. |
6. | Copy of Bills may be shared for sanctioned load and phase information. | Yes. Bills copy will be shared. All the meters will be 3 phase, 415V, 50Hz. |
| Whether the Inverter capacity should be same as the plant capacity? | Yes. It must be same. |
7. | What is frequency of Cleaning the PV panels? Whether maintaining the pressure of water for cleaning is under the scope of vendor? | Periodic cleaning of the solar panels considering the ambient conditions of the site once in a month during DLP and CAMC. Water connection at the same floor at one point shall be provided by Bank. Suitable arrangement must be done by the vendor for pressure pump to maintain water pressure for cleaning. |
8. | Whether MSEDCL Liasoning for all 5 sites is under the scope of bidder? | Yes. It is under the scope of vendor only. |
9. | Whether RCCB is mandatory ? | Yes. It is mandatory. |
10. | Whether UPVC/PVS pipe can be used instead of prefabricated GI cable trays? | GI cable tray as per tender specifications shall be used. |
11. | Whether foundation for the SPV structure is required? | Yes. It is a must and under the scope of vendor. |
12. | What is the Stamp paper value required for various annexures? | Stamp paper value of Rs. 500/- is required. |
13. | Whether Factory tests are required for Inverter also ? | Yes. It is required for Inverter also. PV Panels testing will be done at factory. |
14. | Whether work Completion time excludes statutory requirements? | Work to be completed within 90 days from the 14th day of work order. Work completion time excludes statutory requirements. |
15. | How will total owning cost be calculated? | Please refer page no. 119 for Total owning cost. |
16. | Whether approved makes (DCR/NON DCR) for PV panels can be included in tender? | DCR SPV Panels shall be used as per tender specifications |
17. | Whether POWER CONDITIONING UNITS (PCUs) are centralised or string? | PCUs are string type as all the 05 sites are at different locations. |
18. | Origin of manufacturing country to be specified? | Yes it is to be specified as per details in tender. |
19. | Whether FDR against PBG is applicable? | No. FDR is not acceptable. Only PBG to be furnished. Please refer Page no. 22 of tender document for PBG. |
20. | Whether EMD exemption is there for MSME? | Not applicable for this work. |