The Pre-Bid meeting for the captioned tender was held on November 09, 2026 at 15:00 Hrs. at Conference Room No.2, Bank’s Office Building, RBI, Belapur. Only one firm has participated in the Pre-bid meeting. The details are given in Annex-I.
2. Representative of the firm was welcomed and briefed about the captioned work. The Bank Officials also explained various aspects of the tender which needs to be taken care by them during submission of their bids. Further, the queries raised by the firm, M/s DAccess Security Systems Pvt Ltd vide letter dated November 03, 2026 were discussed with the representative of the firm, who was present during the meeting. The clarifications provided by the Bank are tabulated below:
| Sr No. | Queries raised by firms | Clarification provided by the Bank |
| 1. | Scope and BOQ - The tender specifies 2 Nos. outdoor full-height dual-lane turnstiles. Kindly confirm whether each outdoor unit shall consist of two independent lanes, making a total of four outdoor lanes. | It is clarified that each dual lane turnstiles shall consist of two independent lanes. |
| 2. | Section IX - The minimum passage clearance is specified as 650 mm. Kindly confirm whether a passage clearance of 600 mm or higher can also be considered, subject to compliance with applicable safety and operational requirements. | It is clarified that the bidders are informed to strictly adhere to the specifications mentioned in the tender document. |
| 3. | Section VIII - The tender requires integration with Smart Card, Proximity Card, Biometric, Face Recognition, QR Code and RFID devices. Kindly confirm that all access control readers/devices will be supplied by RBI and the contractor's scope shall be limited to mounting and commissioning. | It is clarified that the system shall comply to as per the details mentioned in Serial Number (i) of clause “Actuating Devices” of Section VIII (Technical specifications) of tender document. |
| 4. | Section VIII - The specification requires both Fail-Safe and Fail-Lock arrangements during power failure. Kindly clarify the required operating mode for the outdoor and indoor turnstiles separately. And UPS availability at bank. | It is clarified that the system shall comply to as per the details mentioned in clause “Logic Control system of turnstile” of Section VIII (Technical specifications) of tender document. The Uninterrupted Power Supply (UPS) will be provided at the nearest point of turnstile by the Bank. |
| 5. | Section VIII - The tender specifies a polycarbonate canopy of minimum 2.2 mm thickness with an SS frame. Kindly confirm whether an equivalent or higher thickness UV-resistant polycarbonate canopy will be acceptable. | It is clarified that an equivalent or higher thickness UV-resistant polycarbonate canopy sheet with SS frame to cover the entire footprint of the turnstile with suitable overhang for outdoor installation may be accepted. |
| 6. | Serial No: 27 of Section IX - The status indicator lamps are mentioned as optional in the technical details. However, Section VIII requires red and green status lamps. Kindly confirm whether these indicators are mandatory. | It is clarified that the status indicator lamps are required as detailed in Section IX of Tender document. |
| 7. | Section VIII - The tender specifies a minimum throughput of 10 persons per minute per lane. Kindly confirm whether the throughput requirement will be evaluated through a practical demonstration during factory inspection or through OEM test certificates. | It is clarified that the same will be tested during Factory inspection. |
| 8. | Section VIII - The contractor is responsible for providing power and signal cables, conduits and trucking. Kindly provide the approximate cable route lengths, installation layout and available site drawings for estimating the associated work. | The site drawings / layout is enclosed in this minutes of pre-bid meeting for reference. However, bidders are informed to visit the site of installation to take necessary measurements and acquaint themselves of the site conditions before submission of bids. |
| 9. | Clause 4.3, Section III - The tender specifies annual turnover of 100% of the estimated cost or more during the last three financial years. Kindly clarify whether this criterion is required to be fulfilled individually in each financial year or based on the average turnover of the last three financial years. | It is clarified that the firm should fulfill the annual turnover of 100% of the estimated cost during the last three financial years individually. |
| 10. | Clause 4.1 & 4.2, Section III - Kindly confirm whether the experience of design, supply, installation, testing and commissioning of full-height turnstiles executed at multiple locations under a single work order will be considered for qualifying experience. | It is clarified that bidders must fulfil the clause 4 (Eligibility Criteria) mentioned in Section III (General Instructions to Bidders) of Tender document. |
| 11. | Serial No: 01 of Section IX - The tender requires documentary evidence of installation of at least three turnstiles of the offered make during the last one year. Kindly clarify whether installations completed at different customer locations can be considered collectively. | It is clarified that the same may be considered subject to submission of satisfactory documentary evidence as mentioned in the Tender document. |
| 12. | Section VIII - The contractor is required to dismantle existing turnstiles and store them safely for buyback. Kindly confirm whether RBI will provide a designated storage area at the site until the old equipment is taken over by the successful bidder. | It is clarified that suitable storage area will be provided by the Bank, however, vendor has to make all efforts to remove the old equipment at the earliest and well before submission of final bill. |
| 13. | Section X - The BOQ specifies buyback of existing Godrej full-height turnstiles. Kindly confirm whether a joint inspection of the existing equipment will be permitted before submission of the financial bid to assess its actual condition. | The firm, M/s DAccess Security Systems Pvt Ltd had undertaken the site visit after prebid meeting. Further, it is informed the interested bidders are permitted to visit the installation site on Bank's working day (Monday to Friday) between 10 AM to 5 PM and acquaint themselves of the site conditions before submission of bids. |
| 14. | Section VIII - The contractor is responsible for civil work, cutting, refilling, levelling and making good the flooring. Kindly confirm whether any major civil or structural modification is anticipated beyond normal installation-related civil work. | The firm, M/s DAccess Security Systems Pvt Ltd had undertaken the site visit after prebid meeting. Further, it is informed the interested bidders are permitted to visit the installation site on Bank's working day (Monday to Friday) between 10 AM to 5 PM and acquaint themselves of the site conditions before submission of bids. |
| 15. | Section VIII - The Bank will provide a 230V AC single-phase power outlet at the nearest location. Kindly confirm whether the existing power supply and earthing infrastructure are adequate for all three turnstile installations. | The firm, M/s DAccess Security Systems Pvt Ltd had undertaken the site visit after prebid meeting. Further, it is informed the interested bidders are permitted to visit the installation site on Bank's working day (Monday to Friday) between 10 AM to 5 PM and acquaint themselves of the site conditions before submission of bids. |
| 16. | Clause 01 of Section V - The completion period is 60 days, reckoned from the 14th day after issuance of the work order. Kindly confirm whether delays arising from site handover, approvals or access restrictions attributable to the Bank will qualify for an extension of time. | It is clarified that bidders may refer to clause 28 and 29 of Section IV (General Conditions of Contract) of Tender document |
| 17. | Section IX - The tender specifies one-year DLP followed by seven years CAMC. Kindly confirm that the seven-year CAMC period will commence after completion of the one-year DLP. | It is clarified that bidders may refer to Part B of Section IX of Tender document. |
| 18. | Section IX - The CAMC scope includes unlimited breakdown calls and replacement of all spares and consumables. Kindly confirm whether major accidental damages, physical damage due to misuse and external electrical surges will be excluded from CAMC coverage. | It is clarified that bidders may refer to Part B of Section IX of Tender document. |
| 19. | Clause 04 of Section V - The tender requires a CAMC Performance Bank Guarantee of 10% of the gross capital cost, with annual reduction. Kindly confirm whether the PBG will be progressively reduced every year based on the original contract value. | It is clarified that the amount of CAMC-PBG will be reduced by 10% of original contract amount year after year for further period of CAMC as mentioned in Clause 04 of Section V of Tender document. |
| 20. | Clause 03 of Section V - The payment terms specify 60% payment after factory testing and delivery and 40% after successful installation. Kindly confirm whether the 60% payment will be released upon delivery and acceptance of equipment at site, without waiting for complete installation of all units. | It is clarified that there is no change in the Tender Specifications and bidders are informed to refer to clause 3 of Section V (Special Conditions of Contract) of Tender document. |
| 21. | Clause 02 of Section V - The tender specifies 5% retention money and an additional 5% Performance Bank Guarantee during execution and DLP. Kindly confirm whether the contractor is required to maintain both securities simultaneously or whether any alternative arrangement is permissible. | It is clarified that there is no change in the Tender Specifications and bidders are informed to refer to clause 2 of Section V (Special Conditions of Contract) of Tender document. |
| 22. | Section IX - The CAMC renewal amount is calculated using the specified WPI and CPI escalation formula. Kindly confirm whether the escalation formula will be applicable from the second CAMC year onwards for the remaining six years. | It is clarified that bidders may refer to clause h of Part B of Section IX of Tender document. |
| 23. | Section V - Factory inspection is required at the manufacturer's premises. Kindly clarify the expected inspection procedure, number of inspections and acceptance parameters before dispatch of the equipment. | It is clarified that there is no change in the Tender Specifications and bidders are informed to refer to clause 5A and 5B of Section V (Special Conditions of Contract) of Tender document. |
3. Further, Bank will not be bound to entertain any further query/clarification from any vendor/contractor in future.
4. These minutes of pre-bid meeting / corrigendum shall form the part of Bid document/ Agreement/ contract.
5. The terms, conditions and specifications of the tender/ Bid document shall continue to remain the same unless otherwise stated / clarified in this corrigendum.
6. The above clarifications are issued for the information& necessary action of all the intending bidders.
7. The submission of bid by the firm shall be construed to be in conformity to the tender/ Bid document and Amendments/ Clarifications given above, if any.
A. Representatives of the firms:
B. Officials of RBI