Tenders



PDF - Minutes of Pre-Bid Meeting - Design, Supply, Installation, Testing and Commissioning (DSITC) Of Goods (Bullion) lift in the Banks Main Office building at Belapur, Navi Mumbai ()
Date : Nov 18, 2026
Minutes of Pre-Bid Meeting - Design, Supply, Installation, Testing and Commissioning (DSITC) Of Goods (Bullion) lift in the Bank's Main Office building at Belapur, Navi Mumbai

(Tender No. 2026_RBI_296394_1)

The Pre-Bid meeting for the captioned tender was held on November 16, 2026, at 15:00 Hrs. at Conference Room No.2, Bank’s Office Building, RBI, Belapur. Only one firm has participated in the Pre-bid meeting. The details are given in Annex-I.

2. Representative of the firm was welcomed and briefed about the captioned work. The Bank Officials also explained various aspects of the tender which needs to be taken care by them during submission of their bids. Thereafter, all the doubts / queries of the firm were discussed during the meeting. The queries raised by the firm and clarifications provided by the Bank are tabulated below:

Sr No. Queries raised by firms Clarification provided by the Bank
1. Section VIII - The tender specifies the type of goods manual lift gearless with Machine Room. Kindly confirm whether goods manual lift geared with Machine Room will be acceptable. It was clarified that there is no change in the Tender Specifications and bidders are informed to refer to Section VIII (Technical Specifications) of Tender document.
2. Section I - Period of Completion - The time period for completion of work mentioned in the tender is 90 days from 14th day of issue of work order. Kindly consider extending the completion period in order to ensure proper execution. It was clarified that there is no change in the Tender Specifications and bidders are informed to refer to Section I of Tender document.
3. Section V –

a) The firm enquired that whether 60% of the quoted rate will be paid after delivery of materials at site.


b) The firm requested that Liquidated Damages may not be levied for delay in submission of licenses from the lift inspector of Maharashtra. Further, the firm has informed that issuance of lift license is subject to concerned Lift Inspector which is beyond the firm’s direct control.


a) It was clarified that bidders must refer to Clause 3 (Payment Terms) of Section V (Special Conditions of Contract) of Tender document.

b) It was clarified that the bidder should make all necessary efforts and follow up with the concerned Lift Inspector to obtain lift license within stipulated period. Further, bidders are requested to refer to clause 28 of Section IV of Tender document.
4. Section V - The firm enquired that whether the 10% security deposit can be submitted in the form of Bank Guarantee instead of deducting 5% from each on-account bill and submission of 5% (Five percent) of the contract value in the form of a Bank Guarantee (BG) from any scheduled Bank as per Annexure X. It was clarified that 10% security deposit of contract value in the form of Bank Guarantee may be accepted from the successful bidder after award of work and bidders are informed to refer to Clause 2 (Type of Security Deposit) of Section V (Special Conditions of Contract) of Tender document.
5. Section III (A) – The tender mentions minimum base rate for Comprehensive AMC as 5% of the quoted capital cost. Kindly clarify whether a lower base rate below 5% can be quoted for Comprehensive AMC. It was clarified that in case the tenderer quotes the rates for comprehensive AMC lower than 5% of the quoted capital cost, then 5% of the quoted capital cost shall be considered for calculation of Total Cost of Ownership. However, the Bank shall pay only the quoted rate of the CAMC during the currency of the committed contract period of 19 years. Further, bidders are informed to refer to Clause 6 of Section III (A) of Tender document.
6. Lift License – The firm requested to kindly confirm whether the Bank will provide the necessary documents for obtaining the lift license from the concerned authority. It was clarified that the Bank shall provide all necessary documents required for obtaining the lift license from the concerned authority. However, if any drawings related to new lift installed is required, the same may be provided by the bidders.
7. Section VIII – The firm requested to kindly confirm whether only wiring for CCTV Camera is required. It was clarified that the wiring for CCTV Camera shall be facilitated along with travelling cable by the Bidders. Further, bidders are informed to refer to Section VIII (Technical Specifications) of Tender document.

Note:- Bidders are requested to kindly refer to the detailed scope of work mentioned in Section VIII of the Tender Document before submission of bids.

3. Further, Bank will not be bound to entertain any further query/clarification from any vendor/contractor in future.

4. These minutes of pre-bid meeting / corrigendum shall form the part of Bid document/ Agreement/ contract.

5. The terms, conditions and specifications of the tender/ Bid document shall continue to remain the same unless otherwise stated / clarified in this corrigendum.

6. The above clarifications are issued for the information& necessary action of all the intending bidders.

7. The submission of bid by the firm shall be construed to be in conformity to the tender/ Bid document and Amendments/ Clarifications given above, if any.


List of Participants: Annex-I

A. Representatives of the firms:

Sr. No. Name Firm
1. Shri Nagendra Kumar M/s Otis Elevator Company (India) Ltd
2. Shri Nagpurwala Mohammed Ayaan Sohail

B. Officials of RBI

Sr. No. Name Designation
1 Shri Nitin Dolare Assistant General Manager
2 Shri Vishwamurthy Vagga Manager (Tech-Electrical)
3 Shri Hemraj Vishweshwarji Walurkar Manager (Tech-Civil)
4 Smt. Rajani Joshi Assistant Manager
5 Smt. Sharmi R Assistant Manager


Archives

Top
Back to previous page